Positioning

Posted: 6th May 2012 by asteriskr in Rallye 16v
Tags: , , , , ,

Another job ticked off the list as the seat mountings have now been adjusted on the seat rails – positioned, drilled, compression tube welded in, ground down and primed. EPAS is now ready to be chopped and have the Lifeline boss welded on, which means we have a steering position at last.

position