Machine Shop Part I

Dropped the revised drawings and the necessary parts in at One Off Engineering in Hyde during the week for them to machine the steering coumn and boss ready for welding.

Steering Column

Once the columns is turned down and the boss bored out they’re going to produce a special top hat spacer to my specification and then drill and pin the lot together. It’ll then just need a buzz over with the TIG to finish the job.

Top Hat Spacer

Leave a comment

Website Powered by WordPress.com.

Up ↑