Satchell Strut Tower Reinforcement

Welded in, primer’s still wet… Did a load of stitch welding to the Peugeot Sport build manual spec too.

Progress

So remaining jobs in the engine bay are:

1. Make some reinforcement gussets for the rear engine mount (these are now templated just need to cut them out of some 3mm plate).

2. Drop the engine and box in, mark up and letterbox the bulkhead so the throttle bodies can fit into the scuttle. This will require some making good.

3. With the engine, battery and brake servo back in fabricate a mount for the oil catch tank.

Leave a comment

Website Powered by WordPress.com.

Up ↑