Machine Shop Part I

Dropped the revised drawings and the necessary parts in at One Off Engineering in Hyde during the week for them to machine the steering coumn and boss ready for welding. Once the columns is turned down and the boss bored out they're going to produce a special top hat spacer to my specification and then... Continue Reading →

Further EPAS Work

Managed a couple of hours this week due to a couple of strokes of luck giving me some time back, so cracked on with work to get the EPAS fitted. The Borgeson double UJ has two what are known as DD fittings of different sizes ( 3/4" DD / 1" DD ). I ordered mine... Continue Reading →

EPAS Update…

Things have run into a snag on the EPAS. The background here is that I am putting a Vauxhall Corsa electric power steering (EPAS) unit into my Peugeot 106. The connection between the end of the EPAS and the pinion on the rack is tight for space (about 5"). I have tested things out by... Continue Reading →

A Little Progress

Photo of the finished box in the scuttle for the wiper motor. Spent a bit of time cleaning up some of the recent welds. Here is the blanking plate over where the heater motor air inlet was. Next job is to modify the steering column support so that I can get the welding in this... Continue Reading →

Website Powered by WordPress.com.

Up ↑