Positioning

Another job ticked off the list as the seat mountings have now been adjusted on the seat rails - positioned, drilled, compression tube welded in, ground down and primed. EPAS is now ready to be chopped and have the Lifeline boss welded on, which means we have a steering position at last.

OMP Wheel Detailing

White on clear TZ tapes came through for the Brother label writer so I was able to have a play around with some of the settings tonight to do some labels for the carbon panel. Worked out okay in the end.

OMP Superquadro

This is one of the projects I mentioned. I am not going to run the steering wheel stalks and I will need to be able to control the Race Technologies Dash2 so I have gone down the route of a steering wheel mounted button panel. Mocked it up in cardboard: Gave the design some thought... Continue Reading →

Website Powered by WordPress.com.

Up ↑